Biogas plant feasability studies 

Through the feasibility study our teams of engineers accompany our customers in their biogas project design through several steps : study of organic waste layer, detailed design of a preliminary draft of biogas installation , key components of the digesters dimensioning and operation of the future digester.

The feasibility study that Naskeo develops has mainly 5 objectives which can help you better define the details of your future biogas installation :

  • Biogas feasability study mapIdentifying and securing the waste layer of your digester.

    The waste layer study makes it possible to identify, characterize the modifiable layer in a radius of 20 to 30 km around the future site of your biogas plant establishment. This layer is protected thereafter by procurement agreements.

  • Technical description of the biogas plants

    The study specifies  the technology of selected biogas plant as well as dimensioning and the technical descriptions of the installation equipment.


Feasability studi biogas plant ObernaiFeasability study biogas plant Obernai

  • Optimization of thermal energy valorisation

    The energy performances of the installations are presented and detailed taking into consideration various possible choices for thermal valorisation, digester positioning as well as various studied anaerobic digestion processes.

  • Analysis of the agronomic stakes of the project.

    The products used as fertilizers are quantified according to the inputs in the digester. The impact of the sludge separation with post treatment combined with spreading can be studied.

  • Economic analysis of the project.

    The study will include investment figures and the determination of the estimated operating statement.
Biogas plant construction planning






Indicative planning for the construction of a biogas plant

Options

Biogas news

French economy relaunch programme and biogas

Measures taken by the French government to encourage biogas plants 

Newsletter

Please enter your email in order to subscribe to our newsletter

TRADESHOWs

1-4/12/09 Pollutec, Paris