Electric connection of biogas installations 


In parallel of the drafting and deposit of your administrative files, we deal for you with the procedures of electric connection of your project of biogas plant.
  • Biogas plant electric connection procedure (with E.D.F. France)
     
- Deposit of the Building permit (Notification of deposit of PC essential to the file)
- Choice of the biogas cogeneration engine ( Manufacturer’s card necessary for the study)
- Constitution of the electric request file of connection for Electricité de France
  • The electric request file of connection of the installation of biogas will contain: 

- Mail describing the project
- Plan of the project and cadastral map with indication of the point of delivery in low tension (delivery point)
- Notification of the deposit of construction permit

Once the file is complete it is sent to the regional contact 

  • Technical study : 
3 types of studies can be made by ERDF (Électricité Réseau Distribution France) :

- Fesability studies
- Detailed study (definite price)
- Definite technical and financial proposal (if there's a building permit)

EDF electrical connectionA study lasts for 3 months and it is valid for 3 months. The launching of work requires a written agreement of the applicant and the payment of an installment. Following the study and the signature of the contract, the intermediate duration of realization of work of connection is from 6 to 8 weeks

Options

Biogas news

French economy relaunch programme and biogas

Measures taken by the French government to encourage biogas plants 

Newsletter

Please enter your email in order to subscribe to our newsletter

TRADESHOWs

1-4/12/09 Pollutec, Paris